Payload EECS
Kha Nguyen |
Progress Updates:
• Introduced members to sensor programming, microcontrollers, and debugging.
• Developed initial payload requirements, timelines, and cost estimates.
• Coordinated joint design meetings with Payload Mechanical.
• Began planning a C++ state machine for payload operation.
Upcoming Tasks:
• Finalize payload concepts and divide work into subsystem responsibilities.
• Develop and test the initial state machine.
• Continue programming, electronics, and soldering training.
• Establish GitHub workflows and obtain necessary hardware and cables. |
Payload Mechanical
Logan Burchfield |
Progress Updates:
• Trained most members on SolidWorks fundamentals and CAD modeling. microcontrollers, and debugging.
• Coordinated with Payload EECS on joint meetings, payload concepts, and design selection.
• Began reviewing payload competition rules and design constraints.
• Developed an initial SOAR CAD drawing template with Stepan.
Upcoming Tasks:
• Finalize payload concepts through trade studies and design selection.
• Begin detailed CAD modeling and subsystem design.
• Coordinate payload mass and placement requirements with Aerostructures. |
Airbrakes Mechanical
Stepan Jankowski |
Progress Updates:
• Established subsystem schedules and initial design concepts.
• Completed trade studies comparing four airbrake mechanisms.
• Narrowed designs to two leading candidates for further analysis.
• Assisted in developing the SOAR CAD drawing template.
Upcoming Tasks:
• Perform preliminary FEA and CFD on selected mechanisms.
• Coordinate dimensions and design constraints with Aerostructures.
• Continue mechanism kinematics and dynamics analysis.
• Develop members' CAD and simulation skills. |
Airbrakes EECS
Matthew West |
Progress Updates:
• Revised subsystem requirements and developed preliminary system diagrams.
• Selected sensor hardware for the control system.
• Began organizing GitHub and training members in PCB design and software development.
• Developed preliminary hardware cost estimates.
Upcoming Tasks:
• Finalize processor selection and submit hardware purchase requests.
• Develop an initial controller and software architecture.
• Create PCB schematics and sensor interface software.
• Test existing hardware and apogee prediction models. |
Aerostructures
Sage Bundhund |
Progress Updates:
• Completed initial airframe CAD and developed an OpenRocket model.
• Continued optimizing fin geometry and mass allocations.
• Developed SRAD nosecone manufacturing and testing plans.
• Conducted SolidWorks training and assigned CAD/research tasks to members.
• Prepared nosecone materials for purchasing.
Upcoming Tasks:
• Finalize airframe and fin dimensions using simulations.
• Complete internal avionics mounting structure design.
• Coordinate payload placement and mass requirements with Payload Mechanical.
• Finalize manufacturing timeline and order nosecone materials
• Provide simulation parameters to Controls EECS. |
Avionics
Matthew Raulerson |
Progress Updates:
• Developed preliminary avionics architecture and functional block diagrams.
• Established subsystem requirements and internal deadlines.
• Introduced members to STM32CubeIDE, STM32CubeMX, and KiCAD.
• Began basic programming and electronics training.
Upcoming Tasks:
• Finalize component selection, wiring diagrams, and hardware purchases.
• Develop code to test avionics components.
• Investigate feasibility of a QFH antenna.
• Improve meeting schedules to increase member participation.
• Continue development of the ground station, recovery electronics, and video transmission systems. |
Safety Officer
Jonathan Koutin |
Progress Updates:
• Began developing subsystem FMEA documentation.
• Completed initial tool check-in/check-out procedures.
• Started organizing SOPs and safety training requirements.
• Reported a successful fire safety inspection.
• Identified ongoing shop mold concerns.
Upcoming Tasks:
• Expand FMEA tables to document potential subsystem failure modes.
• Expand FMEA tables to document potential subsystem failure modes.
• Finalize required safety training and onboarding procedures.
• Ensure subsystem requirements align with ESRA DTEG safety guidelines.
• Continue inventory organization and shop safety improvements. |